$348 Million just to plan seems completely fucking ridiculous. I write in ignorance as I know nothing of civil engineering, but holy crap does that number seem goofy.
post
Imagine if the Vancouver-Portland corridor had HSR before the Quebec-Windsor corridor
thaat's another rail line that needs to happen yesterday. hell, extend it into detroit and onto chicago. if I may dream for a moment, extend it from chicago to o'hare and have a system to transfer to and from rail and air travel painless, so you can connect onto and from international flights
The highest traffic air route on the continent is Toronto NYC, so if the USA and Canada are going to coordinate for HSR that would be the one to do.
Or probably depends on what the plan encompasses. If we're talking geotechnical surveys, elevations, etc for 316mi over mixed terrain and over an international border, then the planning stage could actually encompass a lot (and better planning could save a lot of money for the construction phase).
If it's just a discussion of "how might we do this" with a few plastic models, not so much
that HSR line is a good idea. it should be planned to be compatible with California HSR from the jump so long term plans to connect them together can be done without much hassle. actually now is a good time to standardize non-maglev HSR infrastructure north america-wide
This project is frustrating :( I would happily use this train if it magically existed today, but to me it feels like it’s eating up all of the oxygen. The trains we have are fine. I wish they were faster. But the core problem is the existing rail network is neglected, antiquated garbage and there aren’t enough passenger trains because there’s only room for freight. It would be a lot of work to improve those tracks and add more trains, but something tells me it would be a hell of a lot cheaper, faster, and more effective over time than a one-off megaproject that will never scale and whose timeline is competing with plate techtonics themselves.
I think about half the remaining distance is cheap to build - farmland, etc. 200 mil seems really low though, especially for the land and infrastructure needed near portland and everett.
all 22 comments