you are viewing a single comment's thread
view the rest of the comments
[–] -5 points 2 years ago (1 child)

Panel and code calculations don’t care about those yet and it’s going to be a long time until they do.

  • source
  • parent
  • hideshow 2 child comments
  • [–] 6 points 2 years ago (2 children)

    It's fun seeing someone with so little understanding of electricity spreading the misinformation someone else fed them.

    Most houses existing panel have the capacity for a level 2 charger.

  • source
  • parent
  • hideshow 4 child comments
  • [–] 3 points 2 years ago (1 child)

    100amp or 200amp? I figured a main upgrade will be inevitable with the push to electrify more than the car in houses.

  • source
  • parent
  • hideshow 2 child comments
  • [–] 1 point 2 years ago

    Depends, a 200amp nearly for sure has capacity. A 100amp likely does, but depends how electrified they already are, but many smaller houses that still heat with natural gas will have lots of space left in a 100 amp service

  • source
  • parent
  • [–] -3 points 2 years ago (1 child)

    Strange, most homes where I live only have 20-50 amp services, neither being enough for a level 2 with all the other required panel loads.

    News flash, codes are different in different places!

  • source
  • parent
  • hideshow 2 child comments
  • [–] 7 points 2 years ago (1 child)

    20amp service? Lol, ya if you live in an RV park an EV might not be a great option for you.

  • source
  • parent
  • hideshow 2 child comments