you are viewing a single comment's thread
view the rest of the comments
[+] 131 points 1 year ago* (last edited 6 months ago) (3 children)
  • [+] 31 points 1 year ago* (last edited 3 weeks ago) (2 children)
  • [–] 12 points 1 year ago (1 child)

    Moving them just one is definitely not on purpose, that happens logically when you do as little lifting as possible (Open first, when opening second move it to cover first, repeat). On purpose would be them being totally random, that would have required more work.

  • source
  • parent
  • hideshow 2 child comments
  • [–] 8 points 1 year ago (2 children)

    I feel like putting stuff back in the correct spot would fall under, "Yes, that's part of your job."

  • source
  • parent
  • hideshow 4 child comments
  • [–] 7 points 1 year ago*

    I mean, to be fair these guys are paid the lowest dollar and subcontracted at this point. They literally aren't paid enough to make ends meet, they are too distracted worrying about their lives and family to bother worrying about some poor design that involved having movable panels crossing a pattern forcing an unnecessarily specific alignment.

  • source
  • parent
  • [–] 5 points 1 year ago (5 children)

    Let's say your job is to check whatever is under those lids. How do you best mark it as having been done so you don't re-open the same panel multiple times?

  • source
  • parent
  • hideshow 10 child comments
  • [–] 5 points 1 year ago (1 child)

    You'd have to be pretty dumb to not be able to keep track of 6 lids in a line.

  • source
  • parent
  • hideshow 2 child comments
  • [–] 1 point 1 year ago (1 child)

    If this is your job, you aren't tracking 6 lids, you're tracking all the lids, probably in an entire section of the city. Possibly hundreds. Being able to look at a glance and see if you've already done it is clutch.

    Next time it's time for a check, you put them back on the right way.

  • source
  • parent
  • hideshow 2 child comments