you are viewing a single comment's thread
view the rest of the comments
[–] 18 points 1 year ago* (2 children)

It would look more intentional if the top floor followed the pattern. Wonder what caused the workflow to break down

  • source
  • hideshow 4 child comments
  • [–] 22 points 1 year ago (1 child)

    One of the many times this was reposted, someone had an interesting explanation. These walls are pre-fabricated, and they were mixing up the sections that go on the right with those that go on the left, or maybe walls from other sides of the building.

  • source
  • parent
  • hideshow 2 child comments
  • [–] 12 points 1 year ago

    I saw something like this happen in a new hospital building. What they were doing was cutting the original wood for the headboard, then they used that as a template for the next one, which was used as a template for the next one, at least fifty times. By the end none of the shit lined up at all and it all had to be redone.

  • source
  • parent